Capacity Engineers × months · load vs available

Load heatmap

Planned contract hours per engineer per month, split evenly between the engineers assigned to each contract (assign them on the contract page). Colors compare load against the engineer's monthly capacity — the answer to “can we take another contract without hiring?”.

under 80% 80–100% over capacity

Unassigned contracts

Active contracts this year with no engineers assigned — their hours are invisible to the heatmap until someone owns them.